Deprecated: mysql_pconnect(): The mysql extension is deprecated and will be removed in the future: use mysqli or PDO instead in /home/lil/public_html/include/db_conf.php on line 6

Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /home/lil/public_html/include/db_conf.php:6) in /home/lil/public_html/include/language.php on line 7

Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /home/lil/public_html/include/db_conf.php:6) in /home/lil/public_html/include/language.php on line 7

Deprecated: mysql_pconnect(): The mysql extension is deprecated and will be removed in the future: use mysqli or PDO instead in /home/lil/public_html/include/db_conf.php on line 6
L I L Structural Design - News
   
   

February 2009


• There continues the reception period of the applications for the position of (experienced or beginner) “Architect” available within the company (click here for details on the job). In parallel, there continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (Chiscani Locality - Braila; 6.749 m2).


• There is sealed a great number of new partnerships, collaborations and alliances, which shall lead to the extension of the activity area of the company, and to the consolidation of its design office position, consultancy and management in constructions.


• There are tendered many other construction design works (total design and / or resistance design; structural analysis; structural optimization), construction consultancy, construction management (project management), technical assistance in construction design and / or in the construction performance.

January 2009


• There continues the reception period of the applications for the position of (experienced or beginner) “Architect” available within the company (click here for details on the job). In parallel, there continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (Chiscani Locality - Braila; 6.749 m2).


• On the request of an older collaborator (S.C. "VIFEX" S.R.L. Oradea), there is performed a complete structural analysis (structural modeling, analysis and optimization) for the construction objective "S+P+5E Office Building + Oradea".


• There is granted technical assistance to the entrepreneur (S.C. "IKON IDEEA" S.R.L. Cluj-Napoca) within the effective performance of the drawn up project and delivered in the previous month, "Elicoid metallic structure – stairs and metallic platforms for concrete steel tank of large capacity" (NORWAY; circa 200 m2).


December 2008


• There continues the reception period of the applications for the position of (experienced or beginner) “Architect” available within the company (click here for details on the job). In parallel, there continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (Chiscani Locality – Braila County; 5.500 m2).


• There is finished and delivered to the entrepreneur (“IKON IDEEA” Cluj-Napoca), the project:


- "Elicoidal metallic structure – metallic ladders and platforms for concrete steel tank of high capacity" (NORWAY; around 200 m2).


• There are sealed many other partnerships, collaborations and alliances, which shall lead both to the extension of the activity area of the company, and to the consolidation of its design, counseling and project management office position.


• There are tendered many other construction design projects (total design and/or resistance design; structural analysis, structural optimization), construction counseling, project management, technical assistance in construction design and/or in construction performance.

November 2008


• There continues the reception period of the applications for the position of (experienced or beginner) “Architect” available within the company (click here for details on the job). In parallel, there continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "Elicoidal metallic structure – metallic ladders and platforms for concrete steel tank of high capacity" (NORWAY; around 200 m2).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2).

October 2008


• There is decided the submission to contest of the position of (experienced or beginner) “Architect” available within the company (click here for details on the job). In parallel, there continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2).


• There is started and finished the project:


- "Metallic cover of the screw storage and trading hall and of accessories of clamping and fixing" of the company "BENDKOPP" (Capusu Mare Locality, Cluj County; 24 m2).


• There is updated the licence of "AutoCAD® 2004 LT" to "AutoCAD® 2009 LT" and then there is performed a cross-grade to the newest integrated product AUTODESK®, "AutoCAD Revit Architecture Suite 2009".

September 2008


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2).


• There is performed an upgrade to the three of the company’s systems (the computers) for developing a higher productivity to the CAD applications ("AutoCAD Revit Structure Suite 2009") and FEA ("ROBOT Office" v.21).

August 2008


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2).


• There is performed an upgrade to the three of the company’s systems (the computers) for developing a higher productivity to the CAD applications ("AutoCAD Revit Structure Suite 2009") and FEA ("ROBOT Office" v.21).

July 2008


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2).


• There is finished and delivered the project:


- "STAER showroom and sale space" within "European Retail Park" Braila (Chiscani Locality - Braila; 2.250m2).


• There is launched the project:


- "Office-area production hall and Storage Hall" (Viseul de Sus – Maramures County; 2.050m2).


• There are updated the two licences "AutoCAD® 2007 FULL" and two of the licences of the detailing CAD modules from the pack "ROBOT Office" ("RCAD Steel v.7.0" and "RCAD Concrete v.7.0") to the newest integrated product AUTODESK®, "AutoCAD Revit Structure Suite 2009", including the following three software products: "AutoCAD® 2009 FULL", "Revit® Structure 2009" and "AutoCAD® Structural Detailing  2009".


•  There is purchased a licence for the PTC (Parametric Technology Corporation) program - "MathCAD v.14" and one of the program SYMANTEC - "Norton Ghost v.12".

June 2008


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the projects:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2);

- "STAER showroom and sale space" within "European Retail Park" Braila (Chiscani Locality - Braila; 2.250m2).


• There is started, performed and delivered the project:


- "Mansard-attic arrangement through "metallic framework" to the "CREDO" blocks of flats (Cluj-Napoca County; 2 x 287 m2).


• There are performed the three "ROBOT Office" licences to the last version ("ROBOT Millennium v.21.0").


May 2008


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2).


• There is started the project:


- "STAER showroom and sale space" within "European Retail Park" Braila (Chiscani Locality - Braila; 2.250m2).

This project supposes the performance of an inside secondary structure as “split level” (interim floor) inside "BRICOSTORE & RETAIL" area.

April 2008


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There continues the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2).


• There are started, finished and delivered the changes requested by the beneficiary upon the design:


- "Screw storage and trading hall and of accessories of clamping and fixing" of the company "BENDKOPP" (Capusu Mare Locality, Cluj County; 24 m2).

The requested changes consisted in the extension of the hall with a bay and the performance of an inside secondary structure as “split level” (interim floor) on a bay, on the entire width of the hall.

March 2008


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the project:


- "CINEMA CITY" within "European Retail Park" Braila (com. Chiscani – Braila County; 5.500 m2).


• There are started, finished and delivered the projects:


- "Screw storage and trading hall and of accessories of clamping and fixing" of the company "BENDKOPP" (Capusu Mare Locality, Cluj County; 24 m2);

- "ROMSTAL Representative Office – Storage room and showroom " (S+P) of the company S.C. "Instal Team" S.R.L. Viseu de Sus (Viseu de Sus Locality, Maramures County; 420 m2).


• There is purchased another calculation system (a computer) with a licence of the program "CADian 2008 Commercial" and a pair of licences MICROSOFT ("Windows XP Professional" and "Office Small Business").

February 2008


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the projects:


- "SHOPPING MALL PROMENADA" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.500 m2);

- "BRICOSTORE & RETAIL" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.000 m2);

- "CINEMA CITY" within "European Retail Park" Braila (Chiscani Locality - Braila; 5.500 m2).

January 2008


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the projects:


- "SHOPPING MALL PROMENADA" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.500 m2);

- "BRICOSTORE & RETAIL" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.000 m2);

- "CINEMA CITY" within "European Retail Park" Braila (Chiscani Locality - Braila; 5.500 m2);

- Blocks of flats "1" (S+P+4E) al S.C. "MCR" S.R.L. Cluj-Napoca (Someseni, Cluj County; 2.150 m2);

- Block of Flats "2" (D+P+4E) al S.C. "MCR" S.R.L. Cluj-Napoca (Someseni, Cluj County; 5.411 m2).

December 2007


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the projects:


- "SHOPPING MALL PROMENADA" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.500 m2);

- "BRICOSTORE & RETAIL" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.000 m2).


• There are started the projects:


- "CINEMA CITY" within "European Retail Park" Braila (Chiscani Locality - Braila; 5.500 m2);

- Blocks of flats "1" (S+P+4E) al S.C. "MCR" S.R.L. Cluj-Napoca (Someseni, Cluj County; 2.150 m2);

- Block of Flats "2" (D+P+4E) al S.C. "MCR" S.R.L. Cluj-Napoca (Someseni, Cluj County; 5.411 m2).

November 2007


• There continues the reception period of the application for those two jobs of “Design constructor engineer of construction structures” (with experience and beginner), available within the company (click here for details upon such a job).


• There is continued the work to the projects:


- "SHOPPING MALL PROMENADA" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.500 m2);

- "BRICOSTORE & RETAIL" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.000 m2).


• There are finished and delivered the projects:


- "Split Level of the Handling Hall of the Cluj-Napoca Airport" (Cluj-Napoca; 850 m2);

- "1-dwelling assembly P+M within the Irish Residence Park", beneficiary the company S.C. "SKY VISION ESTATE" S.R.L. (Floresti; 12 x 214 m2);

- "D+P+E Family Dwelling – CERNISOV House" (Cluj-Napoca; 374 m2);

- "D+P+E Family Dwelling – DAVID House" (Cluj-Napoca; 303 m2).


• There are started, performed and delivered the project:


- "REAL" Shop split level within "European Retail Park" Bacau (Bacau; 205 m2).

October 2007


• There is decided the supplementation of the jobs of “Design constructor engineer of construction structures – beginner” from two to five. As a result of the selection and of some interviews, there are concluded three labor Contracts on an unlimited period of time with three of the applicants having applied for those, so that the number of vacant jobs has been reduced to two (click here for details upon the job).


• There are purchased other three calculation systems (computers) together with other three licences of the "CADian 2008 Commercial" program and other three MICROSOFT licence packs ("Windows XP Professional" and "Office Small Business").


• There is continued the work to the projects:


- "SHOPPING MALL PROMENADA" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.500 m2);

- "BRICOSTORE & RETAIL" within "European Retail Park" Braila (Chiscani Locality - Braila; 17.000 m2).


• There is finished and delivered the project:


- "Handling Hall of the Cluj-Napoca Airport" (Cluj-Napoca; 3.000 m2).


• In collaboration with the architecture Office “Arhitectura Noua” (Arch. Flavius MUNTEAN), there are started the projects:


- "12-dwelling building P+M within the Irish Residence Park", beneficiary the company S.C. "SKY VISION ESTATE" S.R.L. (Floresti; 12 x 214 m2);

- "D+P+E Family dwelling – CERNISOV House" (Cluj-Napoca; 374 m2);

- "D+P+E Family dwelling – DAVID House" (Cluj-Napoca; 303 m2).


• In collaboration with the company S.C. "NAPOCA" S.A. and S.C. "ARHINSTAL" S.R.L, there is started the project:


- "Split Level of the Handling Hall of Cluj-Napoca Airport" (Cluj-Napoca; 850 m2).

September 2007


• There continues the period of reception of the applications for the two jobs of “Design constructor engineer of construction structures” and for the two jobs of “Construction engineer responsible with the performance” available into the holding (click here for details).


• There are finished and delivered the projects:


- "Handling Hall of the Cluj-Napoca Airport" (Cluj-Napoca; 3.000 m2);

- "Additional construction objects of CARREFOUR Hypermarket" (Chiscani Locality - Braila; 500 m2).


• There is continued the work to the projects:


- "SHOPPING MALL PROMENADA" (Chiscani Locality, Braila County; 17.500 m2);

- "BRICOSTORE & RETAIL" (Chiscani Locality, Braila County; 17.000 m2).


• In collaboration with S.C. "NAPOCA" S.A. and S.C. "ARHINSTAL" S.R.L., there is started the project:


- "Handling Hall of Cluj-Napoca Airport" (Cluj-Napoca; 3.000 m2).

August 2007


• There continues the period of reception of the applications for the two jobs of “Design constructor engineer of construction structures” and for the two jobs of “Construction engineer responsible with the performance” available into the holding (click here for details).


• There is finished the project:


- "CARREFOUR Hypermarket " (Braila; 16.000 m2).


• There is started the project:


- "BRICOSTORE & RETAIL" (Chiscani Locality, Braila Locality; 17.000 m2).


• There is continued the work to the project:


- "SHOPPING MALL PROMENADA" (Chiscani Locality, Braila County; 17.500 m2).

July 2007


• There continues the period of reception of the applications for the two jobs of “Design constructor engineer of construction structures” and for the two jobs of “Construction engineer responsible with the performance” available into the holding (click here for details).


• There is started, finished and delivered the project:


- "TEHNOLOGISTIC Hall" (Apahida - Cluj; 731 m2).


• There is started the project:


- "SHOPPING MALL PROMENADA" (Chiscani Locality, Braila County; 17.500 m2).


• There is continued the work to the project:


- "CARREFOUR Hypermarket " (Chiscani Locality, Braila County; 16.000 m2).

June 2007


• There continues the period of reception of the applications for the two jobs of “Design constructor engineer of construction structures” and for the two jobs of “Construction engineer responsible with the performance” available into the holding (click here for details).


• There is finished and delivered the project:


- "P+E+2M 6-dwelling-block residence" (Floresti, Cluj County; 5.200 m2).


• There is continued the work to the projects:


- "CARREFOUR Hypermarket" (Braila; 13.000 m2);

- "Logistic Center AMBIENT Sibiu" (Sibiu; 1.200 m2);

- "Covering of the amphitheatre from Ipotesti Memorial House - «Mihai Eminescu» " National Study Center (Ipotesti – Botosani County; 530 m2).


• There is offered the assistance with specialized technical counseling of the company S.C. "CON-A" S.R.L. Selimbar (Sibiu County), within the performance of the (re) designing of the infrastructures of the objectives from "European Retail Park" Bacau, in surface over 30.000 mp, through the performance of the technical Design of the infrastructure. There is continued the insurance of the specialized technical counseling to this company, within the performance of the design and performance of some very high investments.

May 2007


• There continues the period of reception of the applications for the two jobs of “Design constructor engineer of construction structures” and for the two jobs of “Construction engineer responsible with the performance” available into the holding (click here for details).


• There are finished and delivered the projects:


- "Split Level of the MULTICOM construction material Commercial Center" (Zalau; 520 m2);

- "Extension on the North side of the AMBIENT Commercial center Sibiu" (Sibiu; 220 m2).


• There are launched in work the projects:


- "CARREFOUR Supermarket" (Braila; 16.000 m2);

- "P+E+2M 6-dwelling-block residence" (Floresti, Cluj County; 5.200 m2).


• There is continued the work to the project:


- "Logistic center AMBIENT Sibiu" (Sibiu; 1.200 m2);

- "Covering of the amphitheatre from Ipotesti Memorial House - «Mihai Eminescu» National Study Center” (Ipotesti – Botosani County; 530 m2).


• There is offered the assistance with specialized technical counseling of the company S.C. "CON-A" S.R.L. Selimbar (Sibiu County), within the performance of the designing and performance of some special investments, exceeding the surface (each) of 30.000 mp.

April 2007


• There continues the period of reception of the applications for the two jobs of “Design constructor engineer of construction structures” and for the two jobs of “Construction engineer responsible with the performance” available into the holding (click here for details).


• There are finished and delivered the projects:


 - "CONTIU Tourist Pension" (Gura Rîului, Sibiu County; 630m2);

 - "MUNCACIU-MARIAN House" (Feleac – Cluj County; 320 m2).


• There continues the work to the projects:


- "Logistic center AMBIENT Sibiu " (Sibiu; 1.200 m2);

- "Covering of the amphitheatre from Ipotesti Memorial House - «Mihai Eminescu» National Study Center" (Ipotesti – Botosani County; 530 m2).


• There are launched in work the projects:


- "Split Level of the MULTICOM construction material Commercial Center" (Zalau; 520 m2);

- "Extension on the North side of the AMBIENT Commercial center Sibiu" (Sibiu; 220 m2).

March 2007


• There continues the period of reception of the applications for the two jobs of “Design constructor engineer of construction structures” and for the two jobs of “Construction engineer responsible with the performance” available into the holding (click here for details).


• There is finished and delivered the project:


- "Structure Hall – AMBIENT House Râmnicu-Vâlcea" (Râmnicu-Vâlcea; 1.080 m2).


• There is continued the work to the project:


- "CONTIU Tourist Pension" (Gura Rîului, Sibiu County; 630m2).


• There is launched the survey regarding the structural conception, modeling, analysis and optimization for the following projects:


- "Logistic Center AMBIENT Sibiu" (Sibiu; 1.200 m2);

- "Covering of the amphitheatre from Ipotesti Memorial House - «Mihai Eminescu» National Study Center" (Ipotesti – Botosani County; 530 m2).


• There are updated all the ROBOBAT software product licences to the latest versions:  "ROBOT Millennium (full)" licence to the version 20.0; the three licences "RCAD Steel (Otel)" and the two licences "RCAD Concrete (Beton)" to the version 7.0.

February 2007


• The company S.C. "L I L Structural Design" S.R.L. is developing a partnership with the Austrian company "CUBLESAN KEG", (Eigenheimstrasse 18; 4060 - Leonding, AUSTRIA; tel. 0043 - 732783871; fax: 0043 - 732796724; E-mail: lushi@aon.at). The created holding is having – starting now – the possibility to insure contracting and performance services – of high quality – within the field of the civil, industrial, farming and special constructions.


• There continues the period of reception of the application for the two jobs of “Designer constructor Engineer of Construction Structures” available in the company and commences the period of reception of the application for the two jobs of “Constructor Engineer responsible with the performance” (click here for details).


• There are finished and delivered the following projects:


- "UDRESCU Houses - P+M and P+E" (Sibiu; 320m2);

- "FINTA House" (Cluj-Napoca; 450 m2).


• There are started the projects:


- "CONTIU Tourist Pension" (Gura Rîului, Sibiu County; 630m2);

- "MUNCACIU-MARIAN House" (Feleac – Cluj County; 320 m2);

- "Structure House - AMBIENT House Râmnicu-Vâlcea" (Râmnicu-Vâlcea; 1.080 m2);


• On the beneficiary’s request, the company S.C. "AMBIENT" S.R.L. Sibiu, is changing the technical solution of performance of the investment:


- "Extension of the Shopping center AMBIENT Sibiu" (Sibiu; 1.000 m2), passing from the monolith concrete steel floor to that of floor performed from prefabricated pre-slabs, with over-concreting.

January 2007


• The company S.C. "L I L Structural Design" S.R.L. is transferring the registered office in Floresti Locality, in the immediate neighbourhood of Cluj-Napoca Municipality and is opening a working point in the very center of this municipality.


• There is launched a new employment campaign, through the opening of the period of reception of the applications to the two jobs of “Designer constructor engineer of construction structures” available in the company.


• There is continued the work to the changed version (from architectural point of view) of the project:


- "FINTA House" (Cluj-Napoca).


• There is finished and delivered the project:


- "Extension of the Shopping center AMBIENT Sibiu" (Sibiu; 1.000 m2).


• There is launched the project:


 - "UDRESCU Houses - P+M and P+E" (Sibiu; 320m2).

December 2006


• There is continued the work to the changed versions (from architectural point of view) of the projects:


- "FINTA House" (Cluj-Napoca);

- "MOLDOVAN House" (Târgu-Mures);

- "Extension of the Shopping center AMBIENT Sibiu" (Sibiu; 1.000 m2).


• There is updated the licence of "ROBOT Millennium v.19.0" to the full version ("full").

November 2006


• There is worked ("in situ"!) to the project "Wholesale Market from Deymir (Cluj County) through the service performance of drawing up of the necessary designs and material excerpts, which shall be included in the “Construction Book”.


• There is finished the project:


- "Extension of the Shopping center AMBIENT Sibiu" (Sibiu; 1.000 m2).


• There is launched the order for the software licence of "MathCAD v. 13" of the MathSoft company.

October 2006


• There is finished and delivered the project:


- "Office and storage spaces of the company S.C. SMART-EC S.R.L. Bistrita" (Bistrita; 1.100 m2).


• There is launched the project:


- "Extension of the Shopping center AMBIENT Sibiu" (Sibiu; 1.000 m2).

September 2006


• There is finished and delivered the project:


- "DACIA reception service" (Târgu-Mures; 180 m2).


• There is started the project:


- "Production and storage halls" (Târgu-Mures; 800 m2).

August 2006


• There are finished and delivered the projects:


- "Eating hall and guesthouse of the company S.C. AMBIENT S.R.L. Sibiu" (Sibiu; 750 m2);

- "Storage halls of the company S.C. TRINOMUS S.R.L. Cluj-Napoca" (Cluj-Napoca; 710 m2).


• There are launched the projects:


- "DACIA Reception Service" (Târgu-Mures; 180 m2);

- "Office and storage spaces of the company S.C. SMART-EC S.R.L. Bistrita" (Bistrita; 1.100 m2).

July 2006


• There are finished and delivered the projects:


- "D+P+E+M Unifamily House – MUNTEAN House" (Cluj-Napoca; 700 m2);

- "Production hall" (Livezeni, Mures County; 290 m2);

- "DACIA Fast Service" (Târgu-Mures; 330 m2).


• There is launched the project:


- "Eating hall and guesthouse of the company S.C. AMBIENT S.R.L. Sibiu" (Sibiu; 750 m2).

June 2006


• There is purchased another licence of the "CADian 2006 Commercial" program and five MICROSOFT licence packs ("Windows XP Professional" and "Office Small Business").


• There are finished and delivered the projects:


- "Administrative body hall - AMBIENT House Baia-Mare" (Baia-Mare; 1300 m2);

- "S+P+2E Blocks of Flats" (Cluj-Napoca; 1260 m2);

- "Hall, material storage room - AMBIENT House Baia-Mare" (Baia-Mare; 720 m2);

- "DACIA showroom" (Târgu-Mures; 300 m2).


• There are launched the projects:


- "FINTA Family House" (Cluj-Napoca; 605 m2);

- "DACIA Fast Service" (Târgu-Mures; 330 m2).

May 2006


• There is launched the commercial site of the company, www.lildesignsolutions.ro, on which there are presented the "CADian" software products, representing professional CAD solutions, on very accessible prices. As the site www.lilstructuraldesign.ro, this is created by the company S.C. "ARPA media" S.R.L.  even if the main activity rests design and counseling for civil, industrial, farming and special constructions, the company "L I L Structural Design" S.R.L. Cluj-Napoca is succeeding to offer to all the designers, architects and design constructing engineers CAD programs and applications for engineering, 100% compatible and equivalent with the well-known CAD programs, to an incredibly accessible price.


• There are purchased other two licences from the "CADian 2006 Commercial" program.


• They are delivered to some final users the first licences of the "CADian 2006 Commercial" program and several licences of its specific applications.


• There are finished and delivered the projects:


- "Showroom hall – metallic structure with interim floor from concrete steel" (Focsani; 500 m2);

- "Industrial hall" (Bucharest; 660 m2).


• There are started the projects:


- "Administrative body hall  - AMBIENT House Baia-Mare" (Baia-Mare; 1300 m2);

- "S+P+2E blocks of flats" (Cluj-Napoca; 1260 m2).

April 2006


There is obtained the dealer status for all the programs produces by CADian Global Limited, company offering intelligent CAD solutions, on accessible prices to everybody:


- CADian 2006;

- CADian ARCH;

- CADian MECH;

- CADian Architectural;

- CADian ElectCAD.


• The new site www.lilstructuraldesign.ro has been launched. This site is the creation of S.C."ARPA media" S.R.L.


• The first license of "CADian 2006 full" software has been purchased.


• The order for other two AUTODESK ("AutoCAD 2007 full") licenses has been initiated. At the same time, other two licenses for the CAD detailing module part of the "ROBOT Office" package ("RCAD Steel v.6.0" and "RCAD Concrete v.6.0") has been ordered.


• The following projects have been finalized and delivered:


- "Windscreens' Repairing Hall" (Deva; 150 m2);

- "Bakery Hall" (Medias; 285 m2).


• The following projects have been started:


- "Showroom Hall" (Focsani; 500 m2);

- "Industrial Hall" (Bucharest; 660 m2);

- "Meat Products' Storing Hall" (Cluj-Napoca; 710 m2).

March, 2006


• The license "ROBOT Office" was updated again (to "ROBOT Millennium v.19.0" and "RCAD v.6.0").


• The project "Floor Spaces for Carrying Out Services and Offices" has been finalized and delivered (Baia-Mare; 4 storey of 175 m2 each).


• The following projects have been started:


- "MUNTEAN House" (Cluj-Napoca; 700 m2);

- "Windscreens' Repairing Hall" (Deva; 150 m2);

- "Bakery Hall" (Medias; 285 m2).

February, 2006


• A license of the FEA software "ANSYS/CivilFEM v.9.0" has been purchased.


• The project "POPA House" (Cluj-Napoca; 750 m2) has been finalized and delivered.





Print this page
Add to Favorites
Site map
Interesting pages


Versiunea romana


4466699 accesari din 12.04.2006

 


Copyright © 2003-2009 S.C. "L I L Structural Design" S.R.L. Toate drepturile rezervate.

Created and hosted by ARPA media
 
 
     

WooW.ro - Promovare online